This page should focus on coordination rather than procurement alone. A PACK factory may need cells, BMS, structural parts, copper bars, cables, connectors, welding equipment, testing systems, fixtures, labels, packaging materials and spare parts. An energy storage project may additionally require cabinets, racks, thermal-management components, electrical protection devices and monitoring-related products. These resources must match the technical design and project schedule.
Benice Group can assist customers in building a more orderly resource map. This may include category planning, supplier communication, compatibility review, spare-parts strategy, delivery coordination, technical document collection and project-stage matching. For customers entering a new market, such support can reduce fragmented purchasing and help the project team understand which items are critical for installation, commissioning and later operation.
Supply-chain integration is also important for overseas localized manufacturing. A new factory may begin with imported key components while gradually developing local purchasing channels. In this process, customers need to balance quality, cost, delivery, service capability and technical consistency. The supply-chain plan should therefore support both immediate project delivery and future localization.
-
01Support Project DefinitionSupports project-defined prismatic cell applications and product structures.
-
02InspectionModule stacking, compression, busbar assembly, laser welding, and welding inspection.
-
03BMS IntegrationBMS integration, harness assembly, insulation protection, aging, charge-discharge testing, and EOL.
-
04Designed for ESSDesigned for ESS, telecom, industrial power, forklift, marine, starter, and special vehicle applications.
-
05ConfiguredCapacity and automation level can be configured according to project requirements.
-
06Ramp-up SupportFAT, SAT, training, trial production, and ramp-up support.
